P: 02 9679 1176 | E: admin@sppower.com.au
Overhead Power Specialists

Top Ryde Shopping Centre, Sydney NSW

Due to our technical expertise P&U can install a substation in 6-8 weeks compared to the ~12 week industry standard. All six substations were installed and the commissioning stages were completed to meet the builder’s requirements.

ClientBovis Lend Lease
IndustrySubstation
Value$6,000,000
Date2008 - 2009

Scope

Work for complete redevelopment of a 1950s low-rise shopping centre to a multi-level complex including several levels of underground parking, a shopping complex, an entertainment hub and residential towers.

Decommissioning of four substations and HV cables for the existing shopping centre.

Installing two 11kv feeders and a bank of conduits in ‘thermal bedding’ from Ryde Zone Substation (Ausgrid) to Top Ryde Shopping Centre and then around the Shopping Centre site.

Installing six indoor substations: 5 oil type and 1 dry type

Installing new Smartpole lighting through the surrounding streets.

The P&U Difference

P&U was given a tight timeframe to work in. Through effective teamwork all aspects of the project, from excavation to cable jointing to community liaison were brought together to meet every target date and bring the project in on time.