This was a difficult job in a physically tight area. It involved managing traffic stoppages within a very tight time frame. Planning to address timing constraints was a major challenge in managing the project.
Despite these difficulties the project was completed ahead of time and on budget.
Upgrading of the power network for a new freight line for Southern Sydney Freightline.
Duplication of the existing track to separate freight trains from passenger trains and improve train movements.
Installing underground conduit pit and pipe work and installing 2km of 33kV cable by GLT and GST.
GLT (Ground Laid Troughing); GST (Ground Steel Trenching)
Terminating UGOH’s (underground overhead) on poles.
A tight focus on organisation and project management to minimise traffic disruptions around the works area.
The job involved closing roads and bridges during peak traffic periods.